For developers & site owners · Connecticut & New England
Your site has a history. We know how to work with it.
You've found the property. Maybe the math is close but not quite there. Maybe the environmental picture isn't clear. Maybe you've already heard reasons why it can't be done.
We work on sites like this every day.
Where we start
We start with what's already known.
Before you spend money on fieldwork, you need a straight answer about whether the site is contaminated, and what that would mean for what you can build. We start with the records — property history, prior ownership, what was stored there, what regulatory filings exist at CT DEEP, what the seller knows.
If the site is clean, we move straight to feasibility. That means answering the questions that actually drive the decision: How much can you build? How many units or how much square footage does the site support? Is there room for parking, stormwater, setbacks, and access? What will the municipality approve? Are there wetlands, flood zones, or abutters that create problems? What's the realistic path to a permit?
We tell you what's achievable before you make a financial commitment — not after you've closed.
If the environmental picture is complicated, we run both tracks simultaneously. A Licensed Environmental Professional evaluates what's there, what remediation will cost, and what the regulatory path to closure looks like — while the civil and permitting work moves forward in parallel. You don't wait for one to finish before the other starts.
Connecticut's Release Based Cleanup Regulations changed the rules in March 2026: under the Transfer Act, selling a property triggered cleanup obligations; now finding contamination does. A single sample can start a state reporting clock, so we plan the sampling before anyone drills. How the new rules work →
You get a real answer. Not a hedge.
How we work
We stay with it until it's done.
Most sites like this involve more than one discipline. The environmental investigation runs alongside the civil design. The permitting process reveals something that changes the remediation plan. The town throws a hurdle that requires an easement map and utility design for the sewer company. These things don't happen in sequence — they happen all at once, and they need a firm that can handle all of it without the client managing the coordination.
That's how ZUVIC works. One point of contact. Every discipline in-house — environmental investigation and remediation, civil and site design, utility design, boundary and topographic survey, easement mapping, permitting. When something comes up — and it always does — you hear from us first.
We've been doing this in Connecticut and New England since 1988. The sites that look impossible on paper are the ones we know best.
Who you'll work with
The people on your site.

Miroslav Grajewski, P.E.
Miroslav is usually the first call when a new site comes in. He started at ZUVIC in 2012 as a civil engineer, worked through project management and business development, and has led the firm since 2020. He tells you plainly what the site needs, what it will take, and who at ZUVIC will own it.

Victoria Man, LEP
Tory has more than 30 years in environmental work and has led ZUVIC's environmental practice since 2009. She has taken sites from Phase I to state closure on Goodwin University's riverfront campus, at airports and industrial plants, and for New Haven's Route 34 Downtown Crossing, and she sits on the Capitol Region's brownfields steering committee.

Galen Semprebon, P.E.
Designs the site and takes it through approvals. He designed the Willowhaven layout in Newington and the gravity sewer that serves all 40 units, and Goodwin's riverside trail.
Some of what we've done
The work speaks for itself.
Patrick Snow · Newington
A hillside, a wetland, and a sewer route that wouldn't work. Now 40 approved townhouses.
Wetlands permit April 2025 · zoning October 2025
Read the story →Goodwin University · East Hartford
A petroleum tank farm on the Connecticut River. Now a university campus.
$38 million campus · 215 projects since 2004
Read the story →Industrial property · Connecticut
Mapping the petroleum under an industrial plant that never stopped running.
26 borings · 20 new wells · recovery system planned for 2027
Read the story →What our clients say
In their words.
Your firm's impressive knowledge and experience with tank system designs and State regulations concerning tank systems, UST closures, and remediation was critical in presenting feasible options to overcome last minute obstacles and moving our project forward.
Thank you for getting this question of an UST wrapped up for us. Whether it was never there or removed long ago, I am just happy to hear that it is not still there!
Thank you again for all your help. I think the application came together very well and made a strong case for the project's community benefits.
Trusted by
Tell us about your site
A straight conversation about what you're dealing with.
- Book 20 minutes. Tell us what you know — location, history, what you're trying to build. Whatever you know right now is enough.
- We tell you what we see. What we'd look at first, and what the next decision point is.
- You decide. No proposal for more studies unless the site needs one.
Or, if you'd rather write it down first, tell us about your site in a short form. Miroslav or a senior member of the team reads every request personally and replies the same business day.
Questions we hear
Answered plainly.
Are you actually available when I need you?
Yes. When you sign, your project goes to the top of our pile, with a start date and a first-deliverable date in writing. Book a call and you'll talk to an engineer, not a coordinator. If you'd rather write it down, we read every request personally and reply the same business day. When Patrick Snow needed a drainage design letter for a building permit in Southington, it went out nine days after he signed.
I've got a new project that has to be done by the end of the month. Can you make that date?
Once we understand what you're after, we commit to a schedule. Tell us the date on the first call and we'll tell you straight whether we can make it, and which steps are ours to speed up and which belong to the town. When we say yes, the project goes to the top of our pile and the dates go in writing.
How much is this going to cost from start to finish?
We can't honestly give you a total until we know what the site is hiding, so we price it in stages and you never commit to more than the next decision needs. The first step is usually a Phase I Environmental Site Assessment, the first look at a property's history. If it comes back clean, we move straight to feasibility and site design. If it doesn't, you get a price for the next step based on what we found, not on a guess.
How quickly can you get it done?
The early answers come fast: we've taken a developer from signed proposal to a clear answer on a neighboring dry cleaner's contamination in about two months. Approvals take longer, because the town's commissions set the calendar. At Kitts Lane in Newington, the wetlands review ran eight months, and zoning approval came three months after the application went in. We'll tell you at the start which steps are ours to speed up and which belong to the town.
How many units can I put on my property?
That's the first question a feasibility study answers, before you're committed to the site. We look at yield, parking, stormwater, setbacks, access, wetlands and utilities, and what the town is likely to approve. Sometimes the answer changes the plan early. For a Pat Snow property in Hebron, the lot was inside the sewer district but too far from the main, so the design had to plan for septic from the start. The number can also move in review: at Kitts Lane, the wetlands commission's concerns took the layout from 44 units to 40, and it was approved.
Can I build while remediation is happening?
Often, yes, if the cleanup and the construction are planned together. At Goodwin University's Pathways Academy site, the soil cleanup happened while the magnet high school was going up. The state closed the site in 2016 with no restriction on the deed.
What if it's worse than we thought?
Then you hear it from us first, along with what we'd do about it. At Kitts Lane, the utility told us the obvious sewer route wouldn't work. The owner negotiated a route across a neighboring parcel, and ZUVIC redesigned the line so every unit drains by gravity, with no pump stations. On a substation cleanup for Eversource, a confirmation sample failed on the first dig. The crew went back within three weeks, re-tested clean, and the site met residential standards with no deed restriction.
Do I need an environmental engineer or just a civil engineer?
On a site with any history, usually both, and they need to be working from the same plan. ZUVIC runs the two tracks at once. A Licensed Environmental Professional (LEP) works out what's in the ground and what the state will require, while our civil engineers design around it. For a manufacturer adding about 49,000 square feet on a site with a land-use cap, that meant designing the drainage so no stormwater soaked into contaminated ground. Wetlands and zoning then approved the plan unanimously.
ZUVIC Inc. is a Rocky Hill, Connecticut engineering firm for developers and site owners: feasibility, environmental due diligence and cleanup, civil site design and permitting, run as one project by one team.