Thirty years in the Transfer Act program, wells nobody could find, and a plant that kept running the whole time. The free product is now mapped.
- Owner
- Industrial owner, plant in operation
- Location
- Connecticut
- Work
- Record review, well search, 26 borings, 20 new wells
- Outcome
- Free product mapped by early 2026; recovery system expected 2027
An industrial plant in Connecticut stands on filled land near the water, with groundwater only five to ten feet down. The plant has to keep running, and it has been in Connecticut's Transfer Act program since 1996.
Past operations left free product (LNAPL), a layer of petroleum floating on the water table, under one part of the property. It sits beneath a former outdoor drum storage area and beneath the building itself. It had been measured by the mid-1990s. By 2025 the record ran to three decades of reports from more than one consultant, and some of the wells meant to track the problem could no longer be found.
The record
ZUVIC started in July 2025 by assembling the whole record: the state's files, the owner's files, and a chronology going back to 1990. In October the team walked the site looking for the roughly 45 wells on paper. Thirty-two could still be reached. Free product was found in 13 of them, up to almost three feet thick, and ZUVIC sampled 25.

Drilling through the floor
In November ZUVIC cleared underground utilities with ground-penetrating radar and air knives. Then the team drilled 26 borings and installed 20 new wells: 15 placed to find the edges of the free product and 5 to replace wells that had been destroyed. Some went in through the floor of the plant while it was running, with each location cleared around the day's production. One of the new wells found more than a foot of free product where none had been mapped. ZUVIC measured the product's density and viscosity, which determine how it can be recovered, and surveyed every well so the data would line up.
The path to closure
By early 2026 the free product was mapped. ZUVIC also set out the owner's path to closure: the work, the order it has to happen in, and a timeline that runs about a decade. The analysis also covered how Connecticut's new Release Based Cleanup Regulations compare with staying in the Transfer Act program.
The 2026 work is under way: sitewide groundwater monitoring of about 40 wells, a remedial action plan for the free product, design of a recovery system, and help selecting the contractor who will build it. Installation is expected in 2027. ZUVIC's Licensed Environmental Professionals lead the work.
Next step
Tell us what you know about the site.
Twenty minutes is usually enough to tell you what we'd look at first, and what it's likely to take.
Or tell us about your site in a short form and we'll reply the same business day.
ZUVIC Inc., a Rocky Hill, Connecticut engineering firm, rebuilt three decades of site records, drilled 26 borings and installed 20 new wells, some through the floor of the running plant, and is designing the system to recover the free product, with installation expected in 2027.